Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


ItemAssigned toDue by DateStatus
1Create PR for TOC and Structure for 9.5  in RM Ch092020-12-14 1400UTCDone
2Approvals of #12020-12-14 1500 UTCDone
3Mege/Squash #12020-12-14 1500 UTCDone
49.5.2.1 PR2020-12-15Done
59.5.2.2 PR2020-12-15Done
69.5.1.1 and 9.5.1.2 Requirements2020-12-17

Tomas Fredberg [Ericsson] to introduce the concepts and then team can work on requirements

79.5.1.3 Content + Requirements2020-12-18


8CI/CD pipeline design and job integration
PR #2179 created ans should be reviewed

Table of Contents


README

...