Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Attendees

  1. Yan Yang
  2. Trevor Cooper
  3. Al Morton
  4. Jim Baker

Agenda

Table of Contents
minLevel2

Action Items

Task report
labelscvc

Minutes

HPE Exemption

  • Results / application have been approved and been listed in NFVI portal  https://nfvi-verified.lfnetworking.org/#/
  • Have added the notice to the NFVI portal for the suspension of 2019.12 badge
    • "he OPNFV TSC has suspended the OVP2019.12 release for the Infrastructure Badge. Work is now focused on shifting the program to support the requirements developed within the CNTT RC-1 workstream. At this time, no applications for the OVP2019.12 badge will be accepted for review."

2020.r1 Release

  • Dovetail portal updates The latest status for driving the 2020.r1 NFVI badge

      CNTT RC-1 trials

        • Kanag feedback he has proposed enabling results submission to dovetail portal over api in dovetail jerma release https://jira.opnfv.org/browse/DOVETAIL-801
        • Need the Dovetail team to finalize the development plan to support ovp overall requirements.
      • ONAP Frankfurt 
        • The ONAP Frankfurt Maintenance Release 6.0.1 are  finalized on August 25.  and addressed some fixes and updates accross ONAP projects. 
        • VNF test related projects such as VVP VNFSDK are not involved, so test requirements can be based on Frankfurt or Frankfurt maintenance release.

      • CNTT RC-1 Trials
        • According to the previous plan, at least one trial is aiming to complete by end of August (or first week of September).
        • Follow-up action: current status need to track which will affect 2020,r1 release in September.

      Performance Testing Definitions

      Cloud Native Subcommittee Updates

      • Trevor Lovett will send out some proposed time slots for discussion about the plan for the  badges structure (i.e. CNCF vs CNTT, etc.)  to ensure any badges / levels are easily communicated / understood by end consumers.
      • Cross-community requirements gathering is still ongoing. status?Follow-up action: Need to track the discussion status 

      ONES (Sep 28 - 30) and

      Fall

      LFN Technical Community Meetings Plan (October 13-15, 2020).

      Any other business

      • Next Meeting: September 14, 2020