"Engineering to Bridge....."
Let's make sure this technical team can boldly take us where no telecom has ever gone before!
Purpose
This task force will focus on the operational aspects of ensuring that the new organization can function successfully as we launch.
Scope: Operation and tooling aspects including converged workspace, release processes, OVP engagement plan, 2021 planning
Join the mailing list!
https://lists.opnfv.org/g/meldops
Standing Meeting
Thursday 15:00 UTC https://zoom.us/j/94815857848?pwd=d3FXYTZQbWd5ajlWWmxWczZRenhyQT09
Willing Sacrifices (I mean volunteers)
Lincoln LavoieWalter.kozlowski (Telstra)Georg KunzUlrich KleberSunku Ranganath (Deactivated) (Intel)Zhiqiang Yu (China Mobile)Jie Hu (ZTE)ChangJin Wang (ZTE)Ahmed ElSawafPhil RobbBeth Cohen (Verizon)Heather KirkseyToshi WakayamaScott Steinbrueck (AT&T)
Tasks
- Execute Structural plans in alignment with org structure decisions above
- Propose a election schedule for new org - Move to Org/Gov
- Refined Active Contributor calculation to ack CNTT github contributions and verify lfanalytics.io reporting (dependency on Org/Gov criteria)
- New subproject creation (new entities and old entities in new home) & repo creation & Project creation process (discussion in Gov group on work intake - collab w MeldGov) - Move to Org/Gov
- Proposed converged workflow OR keep separate workflows - place on agenda at MeldOps MeldOps
- Create any additional technical committees, working groups, other sub-groups (list workstreams and projects in one table) - Move to Org/Gov
- Tools
- Converge OPNFV/CNTT Confluence Space (wiki.opnfv.org and wiki.lfnetworking.org/CNTT respectively)
- Archive both current spaces, copy select content into new space
- Active projects move to new space
- https://github.com/cntt-n/CNTT/wiki content? (review for unique material)
- Collapse the multi-space design of OPNFV into a flat-wiki - possibly a few different spaces, but not 1 per project
- Generate a list of the content to preserve from the existing wikis
- Create new Confluence instance under new project name
- Build out a common wiki (sooner rather than later)
- Lock OPNFV and CNTT wiki Read ONLY
- Lock/archive then deprecate groups.io for opnfv
- Archive both current spaces, copy select content into new space
- Create issue tracking tool jira.anuket.io MeldOps
- github convergence
- combine githubs after CNTT Elberus (NO SEQUENCING NEEDED)
- Build artifacts (artifacts.anuket.io)
- Setup anuket.io
- Gerrit/Jenkins
- Archive OPNFV Jira
- Create a slack instance for the new project
- Merge CB/Insights reporting (dependency on repos and tool chain) Jim Baker
- Initiate discussions on additional tool merges Trevor Bramwell
- ReadTheDocs workflow coordinate with Gergely Csatari
- docs.anuket.io - separate sub-domains: RI, RC, RM.... Reflect the relationship between the RM/RA/RI/RC objects
- two sep sub-domains for RTD initially
- Global landing page
- GET AGREEMENT ON RELEASE PROCESS/NAMING
- Converge OPNFV/CNTT Confluence Space (wiki.opnfv.org and wiki.lfnetworking.org/CNTT respectively)
- Ensure header files in alignment with any IPR changes (see Legal Section )
- Rename gerrit to anuket
- retain opnfv.org for posterity
- wiki build: Reconcile meetings and schedule management for all concerned parties – create a meeting page in the wiki and zoom bridges
- Release process definition and Release naming conventions MeldOps David McBride
- TAC inform on new merge project/OPNFV name change
- Define mailing list - work with TPM to implement
- best practices: Code hygiene, NACR code reviews and expectations - daily work methods (move to new TSC for discussion)
- Prioritize task list and add due dates
- Cross education on CNTT chapters and OPNFV projects - collaboration domains Sunku Ranganath (Deactivated)
- Determine the release plans for 2021 and meld the cloud native requirements between R*2 and Cloud Native OVP/Kubref (move to new TSC)
- OVP branding strategy coupled with the RC2/RI2 plans (kuberef & marketing problem)
- Define PROPOSAL for the day-in-the-life of the future TSC and discuss the needed operational support (inputs/outputs) - Move to Org/Gov
Interim TSC Election Calendar (revised )
Due date | Step | Phase |
---|---|---|
| Agreed to draw Anuket TSC members from existing CNTT and OPNFV TSCs Begin opt-out phase for OPNFV TSC members Begin compilation of active contributor list based on eligibility criteria | |
| Open period for proposing additions to the electorate | |
| End opt-out phase for OPNFV TSC members | |
1 weeks | Close period for proposing exemptions to the electorate
Begin election of 8 seats of interim TSC drawn from OPNFV TSC members | election |
1 week | Close election period for interim TSC - Announce results on mailing lists (OPNFV, CNTT) | nomination |
| CNTT TSC representatives assignments due Open nomination period for TSC chair and Co-chair | |
| Announce Anuket TSC Open TSC chair/co-chair nomination | |
1 week | End nomination period for TSC chair and Co-chair Open election period for TSC chair and Co-chair | election |
1 week | Close election period for TSC chair and Co-chair Announce results on mailing lists (OPNFV, CNTT, <NEW>) Open nomination period for SPC representative | nomination |
1 week | End nomination period for SPC representative Open election period for SPC representative | election |
| Close election period for SPC representative Elections completed and results announced | |
Begin of 9 month term of interim TSC |