2019-10-16 - [CNTT - RI - 01] - Meeting Agenda and Minutes
Meeting Logistic:
Every Wed. at UTC 12:00-13:00
Attendee List:
@Qiao Fu (China Mobile)
@Bin Hu (AT&T)
@Jim Baker (LFN)
@Michael Fix (AT&T)
@Mark Shostak (AT&T)
@Cédric Ollivier (Orange)
@Trevor Cooper (Intel)
@Pierre Lynch [Keysight] (Keysight)
@Luc Provoost (Intel)
@Daniel Balsiger (Swisscom)
@Fernando Oliveira (Verizon)
@samuel.hellec@orange.com (Orange)
@Al Morton (AT&T)
@Deepanshu Bhatia (VoerEir)
@Hongli Zhang
Meeting Agenda:
1. RI project/RI WS basic introduction, meeting plan, document plan, code plan
2. project/WS working items
1) RI documentation
2) Lab setup
3) OPNFV Infra evolve requirement
4) OPNFV installer collaboration
5) ...
AOB (Any other Business):
Useful Program links
CNTT Re-Org/Workstream (WS, aka "sign-up sheet") info: https://lf-networking.atlassian.net/wiki/display/LN/CNTT+Workstreams
CNTT Kekes (next release, WS tasks/deliveries): https://lf-networking.atlassian.net/wiki/display/LN/CNTT+Kekes
GitHub for Issue/PR tracking (initial "RI Dev" link for example): https://github.com/cntt-n/CNTT/labels/RI%201%20Dev
Cadence
Weekly RI calls will be used to deliver the RI work Stream
Typical Agenda will consist of:
Issues/PRs discussion
Writing & Delivery of Chapter Content
Lab Setup and Delivery Status
RI Scope
RI Core Scope
Eco-system requirements (Labs, tooling, installers, releases and automation requirements)
NFVI, RI, and VNF Requirements.
Chapters:
Ch01: Introduction
Ch02: RI Requirements.
Ch03: NFVI + VNF Target State & Spec
Ch04: Lab Requirements
Ch05: Installers Requirements
RI Labs Scope
Procure initial target lab
Ensure all entry / exit criteria met
Assist with lab selection options (LAAS, Community, Self Service)
Release Alignment
Chapter:
Ch06: Lab Operations
RI Dev (upstream)
Covers installers, automation, etc.
Integration of installers and components.
Gap analysis with required actions for existing eco-system within LFN/OPNFV community projects
Assign Engineering resources into community projects to address gaps
Lead and manage Engineering resources pool
Chapters:
Ch07: Integration
Ch08: Gap analysis & Development
RI Delivery Status
RI Labs - Intel Lab
Target Labs have been identified (Intel Labs POD10 and POD15)
POD10 and POD15 were made available for access & installation on/by 10/9
By EOD 10/15, access requests were being processed and initial connectivity attempts (by Mike Fix) were successful
Additional details
POD10 (CNTT RI PoC) - will be used for initial install of OS via AirShip
Clarification needed as to why we can start on 15 in parallel or first → for PoC, installation validations, not anticipated to impact POD15 delivery cycle
POD15 (CNTT RI target state) - Intel lab utilized: https://wiki.opnfv.org/display/pharos/Intel+POD15
Who needs access?
Test | Validation | Framework: Rajesh/Sridhar, Mehment/Kyle, Cedric, Pierre (placeholder) → Lead Mike confirmed Cedric can lead this area
Installers: Sridhar (confirm if he will work with AirShip OPNFV install process), Luc, Mike/Kyle/Mark → Lead Sridhar confirmed will lead this area
Lab Support / Admin (SAs): Trevor - confirm SA role and responsibility (h/w) → Lead Trevor confirmed will lead, but caveat that this is limited support
To request VPN access please follow Wiki instructions and assign the ticket to Gustave Hellman
https://wiki.opnfv.org/display/pharos/Intel+Labs+VPN+Quickstart
https://help.github.com/en/articles/generating-a-new-gpg-key → GPG key generation
https://help.github.com/en/articles/generating-a-new-ssh-key-and-adding-it-to-the-ssh-agent → SSH key generation
https://jira.opnfv.org/browse/INFRA-354 → Example Request
Meeting Minutes:
1. RI and RC calls are sharing the 1h for now, the situation will change probably for next week. Will send out email notice and calendar invite
2. This call is for the combined team for RI WS and OPNFV new project
3. Will use OPNFV wiki as main page to keep minutes, and will reference with each other from the LFN wiki
4. Document for RI will go to CNTT Github and will follow CNTT release cycle. Code for RI will probably go into installer projects and testing projects within OPNFV, and will follow OPNFV release cycle
5. OPNFV project is suggested to change a new name. After the name is determined, Jim Baker will help create official project page
6. Jim Baker asked about the weekly report at OPNFV TSC. Fu Qiao suggested it should be a report for the CNTT in general, not the responsibility for a single project
7. Mike lead the group to go through the github issues for RI and RC WS. Will proceed the WS work using github. Mike will update the useful link in the minutes page
8. Next meeting will be for the working items, and for specific people who will drive the items.