5G SBP Use Case - Duranta Integration / O-RAN use case = Network Energy Saving

5G SBP Use Case - Duranta Integration / O-RAN use case = Network Energy Saving

 

Use Case Name:

OSC SMO + Duranta ref design to demo O-RAN UCTG Network energy saving Ph1 & Ph2 [reword?]

Use Case Name:

OSC SMO + Duranta ref design to demo O-RAN UCTG Network energy saving Ph1 & Ph2 [reword?]

Use Case Description:

To minimize the total energy consumption of the RAN (e.g., O-RU, O-DU, O-CU) using techniques like cell sleep mode, carrier switching, and dynamic resource management.
Non-RT RIC for long-term optimization policies and SMO for overall management.

Proposed O-RU (Benetel) (and/or Skylark Wireless?)

-Epic

-Problem Statement



Blueprint Owner

Tracy van Brakle

Users Stories



  • Mobile Network Operator (MNO) seeks to implement a solution to lower energy costs within the mobile network.

  • Mobile Network Operator (MNO) seeks to lower carbon footprint.

 

Interaction with other open source projects and components

  • Phase 1- Duranta (with work-arounds as necessary); O-RAN Rome F2F - 1Q’26 (COSMOS)

  • Phase 2- Duranta; O-RAN Seattle F2F - 2Q’26 (UNH-IOL)

Resources -people



Resources (people) to execute on the blueprint:

  • enter name 1

  • enter name 2

  • ...



Steps to Realization

  • What is the very 1st step to realization?

  • 2nd step?

  • 3rd step?

High-level architecture diagram





High level lab topology diagram





Dependencies - list of any dependencies that rely of future releases of a specfic component.



Yes
  • Duranta R1 (Phase 2)

    • Enter details:

or

No

High-level timeline



  • Month that build can begin: enter month/year

  • Approximate duration of build: enter number of weeks or months

  • Approximate completion of outputs: enter month/year

Upstreaming Opportunities



  • enter project(s) and details

Blueprint Outputs 

(Suggested. Not all may apply)

check all that apply:

Code repository
Configuration files (e.g. Helm charts, etc.)
Upstreaming to relevant projects 
Continuous Integration
Test requirements and test results (if applicable)
Documentation:
Overview and Theory of Operation (i.e., what does it do?)
Deployment and setup
Videos
demo
lab setup/behind the scenes
other

Links to existing documentation (Build Guide, Slideware, etc), if available.

Phase 1 - O-RAN-SC SMO + LFN Duranta O-CU/O-DU pre-release (OAI) + commercial O-RU specification-

Reference- see section 4.21 Network Energy Saving-

Links to existing demo/video, if available.



Links to existing code/repos, if available.