Skip to end of banner
Go to start of banner

5G SBP Use Case - Reference Open Source Testbed

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

Use Case Name:

Reference Open Source Testbed

Use Case Description:

Provide a reference test bed of open source 5G and Open RAN components, as a set of known working and tested deployments, through the active maintenance of documentation and deployment

-Epic

-Problem Statement

There is no complete or monolithic project that can be deployed as a complete, end-to-end 5G and Open RAN system. Instead, deployments need to be created from multiple open source projects, that may require different degrees of integration or configuration. In many cases, there are actually multiple open source implementations for some components, showing the strengths of the open source communities. This project will maintain an open source repo of Ansible roles and playbooks, along with applicable documentation, to streamline the deployment of reference testbeds, providing an End-to-End, working configuration of the radio access network (RAN), 5G core, and other components (such as RAN Intelligent Controller RIC, service management and orchestration (SMO) platform, etc.).

Future releases of the project will include automated testing of each reference testbed included in the documentation, along with publication of those test results for each artifact set (i.e. upstream component versions) on a common results dashboard.

Blueprint Owner

UNH-IOL / https://www.iol.unh.edu

Users Stories

  • a.

  • b.

  • c.

Interaction with other open source projects and components

  • a.

  • b.

  • c.

Resources -people

Resources (people) to execute on the blueprint:

Steps to Realization

Refer to: https://oss.iol.unh.edu/o-ran/oran-testbeds/-/blob/main/README.md?ref_type=heads

High-level architecture diagram

Screenshot From 2024-12-17 13-21-05.png

High level lab topology diagram

Screenshot From 2024-12-17 13-22-31.png

Dependencies - list of any dependencies that rely of future releases of a specfic component.

5G Core Network:

Radio Access Network:

High-level timeline

  • Month that build can begin: enter month/year

  • Approximate duration of build: enter number of weeks or months

  • Approximate completion of outputs: enter month/year

Upstreaming Opportunities

  • N/A

Blueprint Outputs 

(Suggested. Not all may apply)

check all that apply:

  • Code repository
  • Configuration files (e.g. Helm charts, etc.)
  • Upstreaming to relevant projects 
  • Continuous Integration
  • Test requirements and test results (if applicable)
  • Documentation:
    • Overview and Theory of Operation (i.e., what does it do?)
    • Deployment and setup
  • Videos
    • demo
    • lab setup/behind the scenes
    • other

Links to existing documentation (Build Guide, Slideware, etc), if available.

Links to existing demo/video, if available.

Links to existing code/repos, if available.

https://oss.iol.unh.edu/o-ran/oran-testbeds/

  • No labels