Skip to end of banner
Go to start of banner

CNTT Hallasan

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Table of Contents

Overview

The intention of this page is to outline what CNTT "success" looks like by June @ LFN DDF 2020, along with high level tracking items that need to be completed.

Success is defined as:

  1. TBD - documentation created ? test suites defined ? test suites executed ?
  2. TBD
  3. TBD

To-Do (In General)

This is a comprehensive list of work that can be done. A subset of the list below will go into  Hallasan (and will be saved in the release notes for Hallasan).

A: To be included in Hallasan Release.

B: Nice to include in Hallasan Release.

C: Low Priority for Hallasan Release.

Reference Model


#Deliverable

Target Date

( // )

Comments
0


1




2




3






Reference Architecture 1


#Deliverable

Target Date

( // )

Comments
1




2




3


4






Reference Implementation 1


#Deliverable

Target Date

( // )

Comments
1


2


3


4


Development














Reference Conformance 1


#Deliverable

Target Date

( // )

Comments













Reference Architecture 2


#Deliverable

Target Date

( // )

Comments
1

Propose solutions to existing gaps (traced back through RA2/RM requirements, linked to specific CNCF or other projects)



2

More details about component architecture (ch04) - dickering level



3

More details about Interfaces and APIs - dickering level



4

More details about security (deep dive in LA) - dickering level



5More details about LCM (deep dive in LA) - dickering level 





Reference Implementation 2


#Deliverable

Target Date

( // )

Comments
1


2


3


4


Development













Picks for Hallasan




  • No labels