Attendees:
Please add your name in here:
- Rabi Abdel (Vodafone)
- Beth Cohen (Verizon)
- Pankaj.Goyal (AT&T)
- Walter.kozlowski (Telstra)
- Scot Steele (AT&T)
- Cédric Ollivier (Orange)
- Kelvin Edmison (Nokia)
- Sukhdev Kapur (Juniper)
- Ahmed El Sawaf (STC)
- Tomas Fredberg [Ericsson] (Ericsson)
- Al Morton (AT&T)
- bill.mulligan (Loodse)
- Karine Sevilla (Orange)
- Gergely Csatari (Nokia)
- Herbert Damker (DT)
- Toshi Wakayama (KDDI)
Agenda and Minutes:
- Recording Policies.
- Anti-Trust Policies:
- Walk-in Items.
- Beth:
- Extend Proofreading until May 11th CoB.
- Agreed to merge M4, M5 (to finish by 11th May).
- Hot fixes will be applied on M6 before release.
- the label "bug" will identify the pending PR needed before Baldy
- Extend Proofreading until May 11th CoB.
- June vConf (first week of June)
- Scot Steele
- Topic proposals: June 2020 Virtual Conference - Topic Requests
- no later 13th May.
- aim to advance the development for Baraque.
- All to Add their topic proposals into the the page shared above.
- Virtual PTG (overlaps with LFN DDF)
- (1st - 5th June).
- will be good to have at least EDGE WS sessions not conflicting with relevant sessions in PTG.
- Ildiko Will share the link and details.
- Beth:
- Baldy Release:
- Proof Reading status
- Technical Steering Topics
- NFG topics:
- Tungsten Fabric.
- Plan to take a phased approach.
- Phase 1: (For now):
- Vendor Agnostic.
- Checking the Compliant to Neutron API and passes RC.
- RI-1: install it in one/two Pods.
- RC-1: Make sure all conformance tests passes.
- We need to make sure :
- RI-1 WS need to align (Raja Jayachandran).
- Sukhdev Kapur to arrange a call with Raja Jayachandran to align.
- Has to pass RC-1.
- 100% alignment with RA-1.
- RI-1 WS need to align (Raja Jayachandran).
- Phase 1 is approved.
- Phase 2 (Future) : (to be approved separately by TSC on due time)
- For advanced features, work with RA-1 to support those features in standard way (vendor agnostic)
- Should be fully cbonfomrant to RA-1 (vendor agnostic)
- Phase 1: (For now):
- Plan to take a phased approach.
- Differentiate VIM (Virtual management from physical management)
- Moved to next week. (not discussed, will be moved to next week).
- Tungsten Fabric.
- TSC to select / approve the committee for the OSTK selection process. Recommend that the committee announce their proposed selection at the June vF2F (with approval to follow).
- Webinars:
- Call for topics/Volunteered.
- Rabi will do first one on Wed 27th May
- Rabi Abdel to create a wiki page (Done)
- CNTT Technical Webinar Topics
- NFG topics:
- Review Current AI.
- Updates from Officers Items:
- Chief Technical Editor:
- ONAP Technical Coordinator:
- OPNFV Technical Coordinator:
- CNCF Technical Coordinator:
- CVC Technical Coordinator:
- Automation and Tooling:
- ONF: Open Networking Foundation.
- ETSI:
Current Action Items:
Task report
Looking good, no incomplete tasks.