Skip to end of banner
Go to start of banner

2020-07-15 TAC Minutes

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Attendees & Representation (default sort: member first name)

TAC Members and Project representatives should mark their attendance below 
Non-TAC project reps do not count towards meeting quorum

X = Present | P = Proxy  (Indicate in the table with @name for @name

MemberRepresenting
MemberRepresenting
MemberRepresenting
ODL XFD.ioXTF (incubation)
OPNFVX@Eyal FelstaineAmdocs
SamsungX

@Anil Guntupalli

Verizon
Cisco
IntelX
AT&TX

IBM

PRed Hat
ONAPXChina Mobile

TBD

Juniper
ZTEXDeutsche TelekomXHuawei
EricssonXOPX (sandbox)
China Telecom
Vodafone
Orange



@David Sauvageau

Bell Canada
Türk Telekom



Tech Mahindra
NokiaXTBDVMware

LF Staff: Casey Cain Kenny Paul Jim Baker Brandon Wick LJ Illuzzi

Others: Qihui Zhao Zhiqiang Yu  Scot Steele Qiao Fu @Xuxia Zhong @Amit Tiwari Kalyankumar Asangi Gergely Csatari 

Agenda

  • Start the Recording
  • Show the Antitrust Policy
  • Roll Call
  • Action Items Review
  • Agenda Bashing
  • General Topics
    • Encourage platform maturity, stability, modularity, and robustness - Discussion
    • Introduction to XGVela - Qihui Zhao
    • CNTT future mode of operations - Options discussion Scot Steele
  • Any Other Topics

Minutes

Discussion - Enabling platform maturity, stability, modularity, and robustness 

  • A SPC KPI exists that asked that we measure the maturity of all the LFN projects
  • cl664y@att.com Jason/Chaker has shared the project lifecycle with the TAC that includes maturity assessments - perhaps a year ago - review and revitalize 
    • Looking to build common criteria cross-projects and have the LFN TAC make the assessment during project reviews
  • FREEMAN, BRIAN D Should have non-ONAP folks review the SP3 approach from ONAP
  • Ed Warnicke  Security surface areas are totally different between ONAP and FD.io by virtue of where they reside in the stack - so we need project specific objectives for these factors
  • Ed Warnicke Believes that the Board should not be implementing KPIs for Projects, just the LFN because KPIs do no provide value to shipping a product.
  • FREEMAN, BRIAN D KPIs cannot be shared across projects, categories might be the same, but metrics may be different
    • Ask the projects what their metrics are for those categories AND determine which ones make sense for the project
  • Next steps: Launch email discussion LFN PMs


Introduction to XGVela


Discussion - CNTT future mode of operations 

  • Scot Steele Reviewed the status of CNTT and the shift away from a task-force to some more sustainable structure and decision making process
    • Option 1: CNTT become a LFN project
    • Option 2: CNTT as a committee of the LFN GB
    • Option 3: Merge CNTT into OPNFV
  • Ed Warnicke Needs of an SDO are different than an open source project - eg. IP handling, ratification of standard

Action items

  • Casey Cain Launch email to discuss the assessment of project maturity.  
  • No labels