Attendance: LJ Illuzzi
Agenda:
- November D&TF Planning
- Opportunities-
RA with Accuknox and KubeArmor - show existing demo to larger audience. - will not be in attendance- SABREs
ORAN SMO (Aarna)- will not be in attendance- Nephio- deploying RAN work loads, etc. (Muddasar). Interest from Research Group in India (NgKore.io?). Funding for intership. Does time permit?
- 5G SBP Library - LJ
- Opportunities-
Attendance: LJ Illuzzi Muddasar Ahmed Ranny Haiby
Agenda:
- LFN Antitrust Policy
- Additional Inputs -
- May need to adjust titles to make it more intuitive- gear it toward the end user, (IT manager, busines need)
- RA can be/may be split into 2 titles
- Rollout Plan
- Additional Inputs -
- November D&TF Planning
- Opportunities-
- RA with Accuknox and KubeArmor - show existing demo to larger audience.
- SABREs
- ORAN SMO (Aarna)
- Nephio- deploying RAN work loads, etc. (Muddasar). Interest from Research Group in India (NgKore.io?). Funding for intership.
- Opportunities-
- What are the SABREs capabilities plan for 2024, as needed for DARPA. Sync with David
- Simplified Slicing- what are the baselines for 5G?
Attendance: LJ Illuzzi ,Rodney Elder , Ganesh Venkatraman (Deactivated)
- Turn "finished" 5G SBP D&TF sessions into deliverables:
Blueprint Outputs
check all that apply:
- Code repository
- Configuration files (e.g. Helm charts, etc.)
- Upstreaming to relevant projects
- Continuous Integration
- Test requirements and test results (if applicable)
- Documentation:
- Overview and Theory of Operation (i.e., what does it do?)
- Deployment and setup
- Videos
- demo
- lab setup/behind the scenes
- other
- Presentation
- Input on Wednesday meeting (instead of Tuesday)
Attendance: LJ Illuzzi Rodney Elder Ranny Haiby Ganesh Venkatraman (Deactivated) David McBride
- New wednesday meeting time starting 05/17
- June D&TF - need to urge session topics and registration:
- Potential 5G SBP Topics: not intended to be finished PoC; rather discussions on current work with the intent to promote collaboration and interest.
- Edge Placement - "Deploying and Scaling Edge Infrastructure from an Operator Perspective"
- 5G SBP: KubeArmor + SEDIMENT project - "SEDIMENT + KubeArmor = IoT Device Authenication & Security"
- Slicing Free5GC and EMCO
- Lab setup?- Kaloom
- Potential 5G SBP Topics: not intended to be finished PoC; rather discussions on current work with the intent to promote collaboration and interest.
- 5G SBP Whitepaper/eBook: Lessions Learned- input from the community
- Wednesday 05/17 meeting will include SABRES presentation
Attendance:Rodney Elder Ranny Haiby David McBride LJ Illuzzi
How do we jump start Edge Placement Project?
- 5G SBP: KubeArmor + SEDIMENT project
- Enterprise Multi Cloud NaaS
Attendance:
Agenda-
2023 events planning on 04/18 call - Heather
New Projects (Equinix/Accuknox)- updates
- Edge Placement - link to Use Case
- SEDIMENT packaging for Accuknox deployment for 5G SBP use case
PCEI Project Updates
Attendance:
LJ Illuzzi Rodney Elder Ranny Haiby
Agenda:
- Central Use Case for next work sprint
- 5G SBP community survey
- Public Cloud Edge Interface as a new project
- Starting point: 5G SBP Use Case - Public Cloud Edge Interface
Attendance:
LJ Illuzzi Ranny Haiby Rodney Elder
Agenda
- Proposal for a 5G SBP community survey
- Work Activities- defining and laying out a workplan
- LFN Mentorship Program
Initial Thoughts:
- Proposal for a 5G SBP community survey.
- Purpose- to identify community skill-sets, time availability to contribute (more then just meeting attendance), interest areas, .....
- Opening- Thank you for being part of the 5G Super Blueprint community and taking this brief 8 question survey. The purpose of this survey is to discover additional skill-sets within the community, interest areas within the community, and gain insights into what accomplishments the community would like the 5G Super Blueprint to achieve in the next 12 months.
- Types of questions:
- Page 1- anonymity
- What originally drew you to attend 5G SBP meetings - pick list of reasons + other (fill-in)
- Business development for my company (getting in touch with potential customers)
- Providing expertise and positioning myself/my company as a thought leader
- Participating in a common learning experience with a community
- Driving the technology solution in a direction that is aligned with my/my company's vision
- Just curious
- Other (please specify)
- What are your current interest areas in the 5G SBP if different?
- 5G RAN
- Mobile packet core
- Automation
- NaaS
- Enterprise Networking
- Public Cloud/Edge Cloud
- Networking apps
- Edge workloads
- Other (please specify)
- How does your company benefit from the 5G SBP?
- Leveraging community shared knowledge
- Showcasing our leadership
- External exposure
- Other (please specify)
- List 3 things you and/or your company would like to see the 5G SBP community accomplish in the next 12 months?
- Use cases:________
- Software components:________
- Target market:_______
- Publications:_________
- Industry event participation:_________________
- Other:_______
- What originally drew you to attend 5G SBP meetings - pick list of reasons + other (fill-in)
- Page 2 - no anonymity
- What specific contributions would you and/or your company like to make to the 5G SBP in the next 12 months?
- Engineering resources to build and document the solution
- Physical lab
- Cloud/Edge infrastructure resources
- Other (please specify)
- What skill sets can you and/or your company bring to the 5G SBP?
- Solution Architecture Expertise
- System Integration Engineering
- Technical writing and marketing (Whitepapers, blogs, e-book, webinars)
- Other (please specify)
- Do you have experience with automation?
- ONAP
- Nephio
- EMCO
- Closed source automation/orchestration
- Other (please specify)
- Can you and/or your company commit development time in the 5G SBP labs? If so quantify
multiple choice options
- What specific contributions would you and/or your company like to make to the 5G SBP in the next 12 months?
- Can we followup with you with an email?
- Page 1- anonymity
- Types of questions:
- Work Activities- defining and laying out a workplan:
- Establish/Re-establish permanet 5G Network capability in the labs
- Must have requirments:
- Core
- RAN
- Automation end-to-end
- .....
- Workplan:
- Step 1
- Task
- Technical resources needed
- Step2
- Task
- Technical resources needed
- Step 3 ....
- Step 1
- Must have requirments:
- NaaS
- Must have requirments:
- LFN and LF Edge projects at the core, cloud, & edge
- Enterprise Use Case(s)
- ...
- Must have requirments:
- Enterprise Use Cases
- Potential for the a 5G SBP project under the LFN Mentorship Program
- During the LFN TAC meeting on 03/01 the question was asked if the 5G SBP could benefit from the mentorship program and vise-verse.
- Considerations:
- Will need a community member to serve as "Mentor"
- Draft a project proposal:
- Bring Nehio into the lab?
- Automation? Leverage EMCO in Hyderabad (Wavelabs)
- Time is of the essense (program deadlines)
Attendance:
LJ Illuzzi Muddasar Ahmed Kenny Paul
Agenda/Notes
- Ops5G Demo- "Over the Air 5G UE Connection to SD-Core". The Ops-5G team would like to present this demop to the 5G SBP community. Potential for a Deep Dive call
- Value statement . Ask for a preview
- NaaS Use Cases
- Next Steps-
- Community participation. Top priority
- GXC- Hardik
- Amar
- Satish (IBM)
- Wavelabs (K8?)
- Kaloom
- Needed skills: K8 (Wavelabs/UNH), RAN (GXC/Kaloom), Core (Amar/Kaloom)
- As needed support
- Project Plan & Skills needed per phase.
- Phases
- Where do we get network. Who is supplying the network, IP pool, VLAN design
- Build K8 (or VM)
- Nephio/EMCO
- Network Functions; RAN and Core
- Network Functions Day 1 configurations
- Enterprise Application(s)/Use Case(s)
- MEC Use Case/application (agriculture, medical, retail, etc.)
- NaaS tie-in
- IP Transport as a Service. Front haul/backhaul
- RAN as a service
- Core as a Service
- MEC as a Service
- Community participation. Top priority
- Next Steps-
Attendance:
LJ Illuzzi Ranny Haiby Muddasar Ahmed Ganesh Venkatraman (Deactivated)
Notes:
- 02-07-23 - Bi-Weekly Status Meeting - Draft Agenda
Attendance:
Ganesh Venkatraman (Deactivated)
Agenda:
- Antitrust Policy
- Lab Updates (Ganesh):
- RAN solution- eliminate faraday cage
- Creation of BOM as consumable for end-users
- Each participating company provide a BOM, then consolidate into an overall
- Next steps with IBM use case(s) - demo at IBM Dallas lab
- How to position ORAN-SC
- How to utilize Wavelabs lab in Hydrabad- lacency may be an issue
- potential to install ORAN-SC to create gNB
- automation dev and test
- Setup call with Wavelabs call after documentation.
- Looking ahead to 2023:
- Tigher alignment with the LFN TAC
- Lab automation and creation of consumable collateral for end-users (DoD)
- Network as a Service (NaaS) Use Case
- Next Advisory Group meeting January 9, 2023
Agenda:
- Antitrust Policy
- Visual Inspection Use Case Documentation: https://docs.google.com/document/d/1dkk84woawkCiLBGSDrcEddXypmD5JFk6/edit?usp=sharing&ouid=115348460061026676315&rtpof=true&sd=true
- Ask- review and provide commentary.
- Release date is Dec 08
- Remote Attestation exploratory call with Peraton Labs; 11/28, 10am PT/1pm ET
- Planning for next work streams:
- Automate existing Use Case with EMCO
- Use Case- deploy & manage edge compute
- LOE - 6 months?
- Whats needed for documentation so that at least EMCO orchestration of Free5GC is consumable?
- Identify integration points
- ORAN-SC SMO (Martial/AT&T)
- LOE
- Needed for deploy & manage edge compute (O-cloud)/(O2 interface) Use Case
- Automate existing Use Case with EMCO
Attendance:
------------------------------
Attendance:
Martial
Muddasar
Ganesh
- Antitrust Policy
- Current Proof Point in progress: 5G SBP Use Case - Factory Floor Visual Inspection - ONE Summit Demo (November 2022)
- Looking ahead:
- Kaloom has committed to providing the 5G SBP Lab on a permanent basis.
- Potential for quarterly 5G SBP webinars. Potential Issue- webinar/Zoom fatigue; is this the right platform
- Use Cases and Placeholders
- Flush out: 5G SBP Use Case -ORAN-SC: RAN Slice SLA Assurance on 10/31 meeting
Attendance:
David Armbrust (Mitre)
Ben Posthuma (GXC)
Abhijit Patil
Martial Ngueko (AT&T)
Sundar Nadathur (Intel, EMCO)
Bob Heinemann
Ganesh Venkatraman (Kaloom)
Muddasar Ahmed (Mitre)
- Antitrust Policy
- Current work item: 5G SBP Use Case - Factory Floor Visual Inspection - ONE Summit Demo (November 2022)
- Use Case Wiki Clean Up
Attendance:
Agenda;
- Antitrust Policy
- What are the core requirements of a 5G Super Blueprint and Use Case?
- Open Source Core?
- Open Source Orchestration?
- ORAN?
- Reference: https://wiki.lfnetworking.org/x/4wAyAw
- Are the right questions being asked to get to the core requirements?
- How is a 5G Super Blueprint documented?
- Are the right questions being asked to get to a documentation process?
Action Items:
- Muddasar Ahmed Fishbone diagram for foundational Use Cases
Attendance:
Agenda:
- Antitrust Policy
- Review Use Case wiki page and Use Case submission template
- Security Lead
- Meeting day/time and cadence
- Next 5G SBP meeting: 07-12-22 - 5G SBP Regular Bi-weekly Status Meeting
- Michael August (DoD) ONE Summit CPF submission
- Demo- Secure slicing, and DDoS
Action Items:
- Muddasar Ahmed Fishbone diagram for foundational Use Cases
Next meeting 11:30am ET, 8:30am PST
Attendance:
@Abhi Patil
@lawrence Kerr
@Ryan McAllister
Agenda:
- Review Use Case Wiki Page and Use Case submission template
- Proposal- 5G SBP "Releases"- New use cases, updated use cases, etc. Proposal for every quarter: "5G SBP Fall2022 Release", "5G SBP Winter2023 Release", "5G SBP Spring2023 Release", etc.
- Proposal- "Tracks" and "Use Cases"
Track: Orchestration
Use Case (under Orchestration Track): Orchestration of Magma with ONAP
Use Case (under Orchestration Track): Orchestration of Free5GC with EMCO
- Security SIG- Muddasar Ahmed (Mitre)- asked about non-functional reuirements; "security orchestration". Ranny suggests we will need to have the capability to demostrate security capabilities. Ranny suggests a security "champion" needs to step foreward. Potential for a security SIG under the Advisory Council - add to June 6 agenda
- Meeting day/time and cadence
- June 5G SBP Meetings
Attendance:
Kickoff Meeting
Recording not available
Attendance:
@Haseem Ahmed
LJ Illuzzi(LFN)
Ranny Haiby (LF)
@martialNgueko(AT&T)
Nadathur Sundar(Intel)
Proposed Agenda:
- Meeting recording to facilitate meeting notes
- Introductions
- Level set on Advisory Group purpose
- Proposed Use Cases
- Use Case: 3Gpp NTN (Haseem)
- Fixed Wireless Access (FWA)
- Process for use case submission and review
- How is the proposal to be documented? (INPUTS)
- Use Case discription
- Problem statement/ what probel is solved?
- Users stories
- Demo storyline
- Interaction with other Open-source components
- Links to existing documentation (Build Guide, Slideware, etc), if available.
- Links to existing demo/video, if available.
- Links to existing code/repos, if available
- What does a 5G Super Blueprint look like? How is it documented? (OUTPUTS)
- Use Case discription
- Problem statement/ what problem is solved?
- Users stories
- Build Guide
- Slideware
- Demo Video
- Can we leverage existing Proof Points?
- Discussion on 5G Core- Magma TSC is looking at a dual core approach, with the 2nd core being Free5GC or OAI. Recommendations have been put forth that 5G SBP should wait on a core decision until this is sorted out.
- Magma
- Magma TSC is looking at a dual core approach, with the 2nd core being Free5GC or OAI
- Free5GC
- OAI
- Open5GS
- Reference: Lab Architecture Draft
- Meeting Cadence and Next Meeting - June 6, 11:30am EST
Action Items:
- @martialNgueko(AT&T) - provide documentation/code links to 5G SBP: ORAN SMO Package - Combining multiple open sources into an E2E package
- LJ Illuzzicreate Use Cae wiki and Use Case submission template
- Test case for "New" Use Case
- Test case for "Existing" Use Case