Attendees:
Please add your name in here:
- Michael Fix
- Mark Shostak (AT&T)
- Ashok Kumar (VoerEir AB)
- Pierre Lynch [Keysight] (Keysight)
- Mark Beierl (VMware)
- Rajamani, Rajesh (Spirent)
- Cédric Ollivier (Orange)
- Daniel Balsiger (Swisscom)
- Justin Higa (Spirent)
- Liang Chen (China Mobile)
- Lincoln Lavoie (UNH-IOL)
- Jiaqiang Zhang (China Mobile)
- Lei Huang (China Mobile)
- Rabi Abdel (Vodafone)
- Rajamani, Rajesh (Spirent)
- Kanag (Huawei)
- Shiby Parayil (IConectiv)
- Trevor Cooper (Intel)
- Yan Yang (China Mobile)
- Jiaqiang Zhang (China Mobile)
Goals of Meeting
- Agenda Bashing
- Antitrust:
- Volunteer Commitment to work on Chapters
- Status (11/20)
- Meet with contributing partners - goal for each Chapter team, and discuss goals and timeline for writing the documentation
- TOC by EOW - Mike will assist, and ask leads to update
- Status (11/20)
- Prototype Plan (Trevor)
- Status (11/20)
- Weekly meetings occurring (Sridhar, Trevor, Luc/Petar, others) - discussing build-out and use of a basic VNF prototype (ETA pending for completion and detailed plans)
- For VNF Prototype Testing:
- We can Leverage SampleVNF projects (and VNFs) for establishing baseline results of NFVI operability/stability
- Can also use 4x Functest VNFs (for benchmarking purposes)
- StorePerf can be used for storage based evaluating
- Status (11/20)
- Deployment and Compliance Validation (Cedric) > covered in RI discussions
- RM/RA requirements extraction (Rajesh, Sridhar) >covered in RI discussions
- Time Permitting
- Issue Updates
*****************************
Detailed Agenda and Minutes:
- Status: 11/20
- Team members were added, and partnered to assist with the creation of the chapter material
- Mike to request each team reach across and start collaborative discussions to create content, starting with a Table of Contents (TOC) by EOW (11/22)
- RC: status | issues
- NFVI
- Ch01: Introduction: Rajesh, Kanagaraj, Manik
Ch02: NFVI E2E C&V Framework Requirements: Cedric, Manik
Ch03: NFVI Test Case Requirements: Georg, Toshi
, Deepanshu
Ch04: NFVI TC Traceability to RA Requirements: Rajesh, Dan, Ashok
- SME: Functest knowledge
- Ch01: Introduction: Rajesh, Kanagaraj, Manik
- VNF
- VNF Prototype Plan - details, dates (Trevor)
Ch05: VNF E2E C&V Framework Requirements: Kanagaraj, Cedric, Shiby (confirmed)
Ch06: VNF Test Case Requirements: Fu Qiao, Yan Yang, Chuyi Guo, Kanagaraj, Shiby (confirmed)
Ch07: VNF TC Traceability to RM Requirements: Rajesh, Kanagaraj, Yan Yang
- SME: Functest knowledge
- Dev
- Deployment Validations (Cedric)
- Ch08: E2E Framework Integration: Cedric, Kanagaraj, Sridhar
Ch09: NFVI Tests Traceability to TC Requirements: Cedric, Yan Yang
Ch10: VNF Tests Traceability to TC Requirements: Cedric, Liping Zhao
, Shiby (confirmed)
Ch11: Gap analysis & Development: Cedric, Kanagaraj, Shiby (confirmed)
- NFVI
- AOB
Status | Milestones:
- Work-stream
- NFVI (Lead = Rajesh, Mike)
- Issues: 6 open
- PRs: 0 open
- Assistance Needed
- (In progress) 11/13 - Sridhar/Rajesh/Mark shifting ownership to RM/RA 1 team for extraction → Rajesh, work with Mark S., Sridhar → work in progress
- (In progress) Manifest validations vs. RA Req → discussed in the RI work stream call, work in progress as AirShip manifests were followed for installs, but confirmation needed to ensure RA requirements have been met; offline discussion happening in email to confirm if manifest require changing
- Tune the declarative files to meet RA requirements (re-deploy)
- Status | Tasks (Work in progress)
- Receive Lab (date)
- (In progress) Translate RA requirements to Manifest Needs (See above for Assistance needed)
- Tune Manifest to match RA requirements (Target End State Lab - POD15) - status of POD 10, then date for POD 15
- Testing
- Prepare automation harness - connectivity, validation (POD10)? – Cedric?
- e.g. functest-smoke-cntt was just created. neutron-tempest-plugin-api is already conformed with the current API section.
- Create Test Plan
- Finalize Test Harness/Framework
- Perform Manifest Validations
- Results Collection & Normalization
- Prepare automation harness - connectivity, validation (POD10)? – Cedric?
- VNF (Lead = Mike)
- Issues: 6 open
- PRs: 0 open
- Assistance Needed
- Empirical Validations - VNF Prototype Plan / Strategy
- Trevor - details / dates for Network profiles and testing
- Status | Tasks (Work in progress)
- VNF Prototypes
- (In Progress) Families Identified
- (In Progress) Test Requirements Identified
Strategy
Use POD10 for Network Intensive.
Measure stats related to the NFVi datapath capacity.
- Goal will be to demonstrate full automation of the environment (continuous deployment) with test cases with some useful test results (continuous testing).
- Status? Then look at adding compute and storage intensive VNFs and identify test cases that map back to CNTT specified capabilities. (Luc, Sridhar, Al, Trevor - creating more detailed plan?).
- Testing
- Create Test Plan
- Finalize Test Harness/Framework
- Results Collection & Normalization
- VNF Prototypes
- Dev (Lead = Cedric)
- NFVI (Lead = Rajesh, Mike)
AOB:
- Item 1
- Item 2
- Item 3
Notes:
- General
- CNTT Jan 2020 Release: CNTT Snezka
- RC Documentation - https://github.com/cntt-n/CNTT/tree/master/doc/ref_cert/lfn
- To be written (completed) by the CNTT Jan Release
- RC
- Re-Org
- Personnel
- RC Organizer: Mike Fix (AT&T)
- CNTT RC1 NFVI: Leads = Rajesh Rajamani (Spirent) and Mike Fix (AT&T; Co-lead = Dan Zu (Huawai)
- CNTT RC1 VNF: Lead = Mike Fix (AT&T); Co-leads = Kanagaraj Manickam (Huawai), Yan Yang (China Mobile)
- CNTT RC1 Dev: Lead = Cedric Ollivier (Orange); Co-leads = Kanagaraj Manickam (Huawai), Yan Yang (China Mobile)
- Personnel
- (old) RM Ch 8 Issues & PRs:
- Re-Org
Actions:
- 11/20 Meeting
- Owner: All →Review/respond to GitHub issues by
- Owner: Rajesh - determine a target date for POD15 installs, taking into consideration POD10 install completion, manifest validations, and API health/smoke tests, being done BEFORE POD15 installs by
- Owner: Mark (Victor) - Setup call to start Tracing RM Comp to RC Chapter sections by
- Owner: Fu Qiao - identify how to incorporate, or start developing, PDF and SDF consumables by
- 11/13 Meeting
- Owner: All →Review/respond to GitHub issues by
- Owner: Leads - Review / Add Milestones to the Minutes in the Appropriate 'Status | Milestones' section by
- 11/06 Meeting
- Owner: All →Review/respond to GitHub issues by
- 10/30 Meeting
- Owner: All →Review/respond to GitHub issues by
- Owner: Rajesh - get current status from Srihdar on POD10 installs, and open a GitHub issue to track the deployment by
- 10/23 Meeting
- Owner: All →Review/respond to GitHub issues by
- Owner: Leads - Assign / work action items by EOW
- Owner: Rajesh - Meet w/ Trevor + others to discuss overall CNTT Lab Requirements (needs - e.g. POD10, 15, 17-18 (AirShip), 19-Test Tools, etc) by
- Rajesh (host), Trevor, Mark, and Mike - met to discuss the Intel labs and their intended use; acknowledge 10/15/19 are used for CNTT PoC/TargetState/TestTools labs. 17 and 18 are being used by the Airship project, but not CNTT. Next steps are to research the availability of a 2nd lab within Spirent, and to attend upcoming LF Lab Planning Sessions for future lab needs/support.
- Owner: Cedric - open a GitHub issue for the setup of the Jenkins hosts for RI validation by
- 10/16 Meeting: Yielded time to RI Kickoff discussions. Refer to RI meeting notes for 10/16 for details
- Setup recurring call for RC series starting 10/23
- 10/9 Meeting
- Owner: All → Review/respond to GitHub issues by
- Owner: Impacted Individuals (Test, Installer, Support) - needing access to POD15, request/receive access by
- Owner: Mike - confirm with Cedric O. (Orange) if he will be the "lead" to centralize Implementation & Adoption of Test Hardness/Framework efforts on/by
- Owner: Rajesh - confirm with Sridhar (Spirent) if he will be the "lead" to centralize s/w deployments on/by