Minutes
Update from TAC presentation
Survey of End Users
TBD- Jim was raised the idea of development a survey
- Current feeling is, participation in Anuket should indicate the end user interest in the banging program
- Additionally the go/no-go decision should help with verification of the requirements set
- Agreement to not develop a specific survey at this time
TBD- Recommend to the project to develop a set of CNF compliance requirements.
- The modeling team is potentially taking the role of developing these requirements, as part of the I-release
- Proposal on the results format, for the specific information that should be includes as part of the test results
- https://wiki.onap.org/display/DW/Anuket+Assured+-+ONAP+CNF+Compliance+Badge
- Test ID - Traceable to the requirements (i.e. defined by modelling subcommittee, etc.)
- What needs to be defined and agreed is the information model / requirements with each test results, then we can verify if xTesting results and other tool output meets those requirements.
- Kanag will lead an effort to standardize the results requirements in terms of the information included with each test result or test case output.
- We will need to do a gap analysis of the above, compared with the current xTesting output / structure, as well as how requirements are being traced within the RC-1 and RC-2 documentation today.
2021 Release Planning
- OVP Anuket Assured Re-Launch Release Plan
- Badge categories vs badge attributes to deal with different requirements set (i.e. ONAP requirements vs Anuket RC-2 requirements).
- Need to make it clear, which project releases would be reflected by the 2021 July badges. Could this drive a 2021 roadmap, for what comes beyond the July release (i.e. remainder of 2021 and possibly longer).
Any other business
- Next Meeting: April 5, 20212021
- Can we update the groups.io calendar invite to one meeting.
{"serverDuration": 560, "requestCorrelationId": "01f787265b8244949de9fe35c0763a85"}