2020-05-11 - [CNTT NFG] - Meeting Agenda and Minutes



Go to start of metadata

Attendees:

Please add your name in here:

  • @Walter.kozlowski (Telstra)

  • @Tomas Fredberg [Ericsson] (Ericsson)

  • @Sabine Demel (Deutsche Telekom)

  • @Ian Gardner (Vodafone)

  • @Sukhdev Kapur (Juniper)

  • @Rabi Abdel (Vodafone)

  • @Kodi (Vodafone)

  • @Ed Horwath  (AT&T)

  • @Pankaj.Goyal (AT&T)

  • @Ahmed El Sawaf (STC)

  • @Toshi Wakayama (KDDI)

  • @Oya Gilligan (Vodafone)

  • @Karine Sevilla (Orange)

  • @Suresh Krishnan (Deactivated) (Kaloom)

  • @Petar Torre (Deactivated) (Intel)

Agenda:

Minutes & Actions:

Minutes

  • Webinar: LFN  organized webinars; Networking topic: Network Model, speakers: Walter, Tomas. CNTT Technical Webinar Topics


  • High priority items:

    • SDN: currently RA-1 we assume Neutron API compatibility. The issue: either maintain this view or propose beyond this view (e.g. using upstream OpenStack, or use Heat templates, etc.). See AI #8.

    • Spine-leaf architecture: h/l diagram in RM? is this over-specifying? Does RA-1 needs more information form RM? RA-1 does not need more information: Pankaj. To be continued in the next meeting (parked).

Action Items

1

Request merging approval from Kelvin and Rabi to  PR#1325 into the Master RM; proposal is to include in RM Chapter 3.  Proposed section 3.5 or 4.3 to be agreed at RM meeting. PR will be needed after approval.

29 April 2020

Walter

Closed

email/RM meeting

2

Need to distinguish between VIM and Cloud Infrastructure Manager, and reflecting different levels of infrastructure management.  Topic for TSC.

29 April 2020

Rabi

Open

agenda for TSC

3

Write up an email proposal regarding short term position on SDN (needed for RC) and long term position on SDN APIs (Neutron extension) for an offline discussion

(An email is sent to the team by Sukhdev) 

29 April 2020

Sukhdev

Closed

email

4

Draw a network diagram similar to other diagrams in Chapter 3

11 May 2020

Walter and Tomas

Done



5

Create PR to move network concepts, model and deployment examples into 4.3

11 May 2020

Tomas

Open

RM Sec 4.3

6

Present the NFG view on the proposed implementation of Tungsten fabric  (see Minutes above) to Rabi and if needed TSC for their approval

5 May 2020

Walter

Closed

Email/call

7

Plan for the long term  CNTT view on SDN controller, to be presented to NFG

11 May 2020

Walter

Open

offline call

8

Draft a summary of the problem and propose options; Walter to organise this work

25 May 2020

Pankaj, Ahmed, Sukhdev,Tomas,Walter (lead), Suresh

Open

RM, RA-1, RA-2(?)

9











10











11











LikeBe the first to like this