2020-09-01 [CNTT EDGE] - Meeting Agenda and Minutes

Attendees:

Please add your name below: Name (Company) :

  • @Ahmed El Sawaf (stc)

  • @Tomas Fredberg [Ericsson] (Ericsson)

  • @Beth Cohen (Verizon)

  • @Pankaj.Goyal (AT&T)

  • @Tom Van Pelt (Deactivated) (GSMA)

  • @Mehmet Toy (Verizon)

  • @Sukhdev Kapur (Juniper)

Agenda and Minutes:

  •  

  •  

    • CNTT Baraque  

      • Milestones 

        • May 29: M1 (Release Planning/Requirements)==> Done

        • Jun 19: M2 (Issue Logging)==> Done

        • Sep 14: M3 (Freeze contributions)  

      • Outlines and Roadmap items :

        • FPGA

        • Architecture 

  •  

    • liaison

      • Do we need it right now (Y/N) 

        • LF-Edge -akraino : Presentation about Akraino Edge work and how it can fit with this workstream, also talk about other LFEdge Projects

        • OpenStack - StarlingX :

        • GSMA - LFN joint meeting to discuss mutual work, will probably be more that will come back into the Edge CNTT group.   GSMA has two working groups, Requirements (Specs for Telco Edge Clouds) and Trials (Commercialization of the Edge, work between vendors and Telecos) groups.

        • TIP : update , we have a meeting with TIP& FB

        • O-RAN = WG 6

        • ONAP – Maybe for the TSC rather than just Edge.  How would we consume ONAP differently at the Edge?

        • CNCF – KubeEdge, 

    • Meeting Calendar (added by Pankaj)

Minutes:

Discussion about how to look at Akraino to see what Blueprints align with the Edge WS requirements.  Akraino has some other parts that are probably useful for other parts of the CNTT project work.  We need to look at options for incorporating the blueprints into the CNTT architectures.  

Everyone is overloaded, so we need to complete the architectures docs first, before jumping into the next phase.  In phase 2 we can move on to the next set of work.

Get someone from the KubeEdge project to speak to the team about that project – @Ildikohas a contact (Kevin Wong) and will try to do a joint meeting with OSF Edge WG .  https://calendar.google.com/calendar/embed?src=8rjk8o516vfte21qibvlae3lj4%40group.calendar.google.com

KubeEdge group has two meetings on Wednesday China standard time.  Will need to schedule the best time.